Solana mainnet // fair launch protocol

Mint the flock

Connect your wallet, choose a quantity, and claim a Nightjar unit before the signal closes. This static prototype shows the complete front-end flow without executing transactions.

Countdown lock

Signal opens August 23, 2026.

Quantity, receipt, network fee preview, and mint progress all update inside the console. The disabled state makes it clear that a real wallet adapter still needs to be connected for production.

00Days
00Hours
00Minutes
00Seconds
3,412 / 10,000 reserved 34%
Launch sequence

Three phases. One signal.

The roadmap is written like an operation timeline so collectors can understand access, public mint, reveal, and the post-mint investigation at a glance.

Phase 01

Whitelist sweep

Verified community operators receive an early window and reduced 0.25 SOL access before the public console unlocks.

Phase 02

Public mint

Open 0.35 SOL mint with wallet-level limits, visible progress, and a receipt designed to support real wallet adapters later.

Phase 03

Reveal event

Trait metadata, rank classes, and encrypted origin fragments resolve after sellout or scheduled reveal.

Live signal feed

The console should feel alive before it is connected.

These rows simulate the kind of operational feed a production mint could populate from real events: wallet connects, queue changes, metadata locks, and mint confirmations.

00:14Wallet adapter standby check completedGreen
00:21Metadata cache warmed for unrevealed unitsGreen
00:32Public mint queue awaiting countdown unlockAmber
00:45Trait reveal contract address placeholder copiedGreen
01:03Secondary marketplace routing pendingAmber